Data Center Construction: Vantage Data Centers – San Antonio, TX

Project Type: Data center (data processing)

Address: 5207 Rogers Rd, San Antonio, TX 78251

Total Project Value: $272.5 million

Project Size: 234,548 sq. ft. on 31.4 acres

Sector: Data & Digital Infrastructure

Stage: Active with recent accessibility filing

Detected by Mercator.ai.

Early discovery through construction intelligence

This project surfaced on Mercator.ai shortly after filings appeared, giving contractors and suppliers a crucial head start. The platform’s AI-driven construction intelligence scans permits, accessibility reviews, site plans, and environmental records, connecting the dots between documents and decision-makers. That automation enables business development teams to see what’s coming before traditional bid lists or media coverage catch up. The project’s dedicated page on Mercator.ai centralizes updates, contacts, and milestones so teams can evaluate fit and prepare outreach while competitors are still in the dark.

Project overview

According to the project export, Vantage Data Centers is advancing a three-story, 234,548-sq-ft data-processing facility on a 31.4-acre site at 5207 Rogers Rd in San Antonio. The program is typical of hyperscale infrastructure: high-density server halls supported by mission-critical mechanical and electrical systems, including switchgear rooms and CRAC units, with robust structural and envelope considerations for reliability and uptime. The site is zoned Commercial (C-3), and the total project value is listed at $272.5 million. The sector is identified as Data & Digital Infrastructure, and the project type is New Construction, indicating greenfield build-out rather than retrofit. Imagery on page 1 of the export shows the parcel boundary and a streetscape view, underscoring the available land area and access conditions at Rogers Rd. If a general contractor selection has been made, it is not prominently noted in the export; the page instead emphasizes entitlement activity and filings to date, suggesting the project remains in or near procurement for major trade packages. (Source: project PDF export, p.1.)

According to data visible in the AI Research Assistant panel on page 1, recent work items include architectural, electrical, and mechanical scopes consistent with mission-critical facilities, from CMU and steel packages to interior build-outs and crane operations. These details align with typical Vantage campus standards and point to opportunities for specialty trades with hyperscale experience. (Source: p.1.)

Recent activity timeline

Mercator.ai’s timeline aggregates filings so teams can follow momentum at a glance. The Project Registered window is shown from Aug 4 to Oct 8, 2025, reflecting the period in which core data was assembled and verified on the platform. Immediately afterward, an Accessibility Compliance entry appears dated Oct 9, 2025, labeled “Vantage data centers level 2 — new 2-story data center for data processing,” confirming code-related progress and signaling continued design documentation. On earlier entries for this same address (visible at the bottom of page 2), a Post Permit Review – Mechanical approval appears on Apr 22, 2025, while a separate site work building-permit record notes mass grading and utility work, with a release to CPS dated Apr 29, 2025. Together, the filings show a project moving from site preparation and entitlement reviews toward vertical scope and interior systems. Mercator.ai tracks these shifts automatically, notifying subscribers when statuses change so outreach can be timed to each new milestone.

Subscribers to Mercator.ai receive real-time alerts as accessibility, mechanical, or building-permit entries update—turning the platform into a live project tracker for business development teams.

Stakeholders and insight

The export lists Vantage Data Centers as the owner/developer, with additional companies appearing alongside specific filings. On page 2, Pesado Construction is referenced on a site-work building-permit entry covering mass grading, utilities, and tree removal, while Protection Development Inc. is associated with a site-plan record and mechanical post-permit review. A sidebar on page 1 also groups companies and people tied to the address and sector. While the full architecture and engineering roster is not exhaustively itemized in the PDF, the named firms suggest an evolving team as packages advance from entitlement and civil to mechanical and vertical work. (Source: p.1–2.)

For bidders, the presence of a site-work contractor on earlier phases is not unusual on hyperscale campuses, where owners may fast-track earthwork and utilities prior to full GMP. Vendors who have supported Vantage on comparable data-center builds—particularly in switchgear, generators, UPS systems, cooling plants, controls, and structured cabling—should monitor the project closely on Mercator.ai for contact updates and document releases.

Construction and bidding context

Mission-critical projects of this scale often proceed under CM at Risk or negotiated delivery with early trade partner engagement. Even when a prime has not been publicly posted, owners will frequently prequalify specialist subs for electrical, mechanical, and low-voltage packages long before full CDs are issued. The activity shown across accessibility, mechanical reviews, and site-work records indicates design is maturing and that heavy scopes—power distribution, cooling, steel, enclosure, interior MEP racks, BMS/SCADA, and commissioning—will be central to competitive differentiators. Given the reliability requirements in San Antonio’s climate, bidders with demonstrated N+1/2N redundancies, hot-aisle/cold-aisle containment, and rapid equipment lead-time strategies will present stronger value.

Tracking this project in Mercator.ai lets GCs and subs watch for shifts from entitlement to procurement, align with the owner’s sequencing, and anticipate when bid packages drop. The platform’s contact directory and project-stage alerts reduce manual research and help teams prioritize pursuit resources as the project transitions from civil/site to vertical and fit-out. (See the project profile on Mercator.ai.)

Market context — why it matters

San Antonio continues to attract large-scale digital-infrastructure investment, supported by power availability, land economics, and network connectivity across the I-10 and I-35 corridors. A $272.5 million, 230k-plus-sq-ft facility adds capacity for cloud and enterprise workloads, reinforcing the region’s role in Texas’s data-center growth alongside Austin and Dallas–Fort Worth. For building teams, that means steady demand for high-amp distribution gear, mechanical plants sized for year-round reliability, and interiors built for future expansion. Mercator.ai is a useful lens on these trends, surfacing where capital is flowing and which owners are most active so firms can position ahead of the next wave. (Source: project export, p.1.)

How builders use Mercator.ai

Builders, manufacturers, and suppliers use Mercator.ai to discover early-stage projects like 5207 Rogers Rd, verify stakeholders, and prioritize outreach based on real-time signals. The platform consolidates fragmented data—permits, accessibility filings, site plans, contacts—into a single, searchable record. Teams set alerts by stage or filing type and lean on the company directory to map relationships across owners, engineers, and contractors. That workflow shortens research cycles and improves hit rates on pre-bid conversations, which is especially valuable on fast-moving data-center programs. (Track updates on Mercator.ai.)

Track this project

Stay in front of this opportunity. Track the 5207 Rogers Rd data center on Mercator.ai to receive alerts as filings, contacts, and stages update—or create a free account at Mercator.ai to follow additional data-center builds breaking ground across Greater San Antonio.